Today I could really see progress with the house! The patio side of the house is framed and sheeted outside. On that side of the house the exterior door , windows for the two guest bedrooms , and the guest bathroom windows are framed and cut out of the sheeting. We temporarily hung a few pieces of our siding and the guest bathroom window to see how they looked. We are pleased with our decisions so far. The new front of the house is sheeted. We will measure for the windows on that side next week and get them framed in and siding cut out. The mud room even has the subfloor down. Joe wound up redoing and reinforcing the old floor as joists were 24 inches apart and he changed to 16 inches apart for better support.
Interior walls can't be too far off in the future!!!
First two pictures are of the SAME wall. First is of the Old sheeting, insulation and siding taken off the house. Second picture is of the new sheeting put up the next day. New windows will have to be framed in. Last picture is on the patio side. Two guest rooms, guest bathroom, and hall to exterior patio door.
No comments:
Post a Comment